S.I. No. 200/1964 - Wicklow Harbour Works Order, 1964. Skip to content Disclaimer Feedback Helpdesk Gaeilge Léim go dtí an t-ábhar Séanadh Aiseolas Deasc chabhrach English Gaeilge English Produced by the Office of the Attorney General Táirgthe ag Oifig an Ard-Aighne Home Legislation Acts of the Oireachtas Statutory Instruments Pre-1922 Legislation Constitution External Resources Bills (Houses of the Oireachtas) Iris Oifigiúil / Official Gazette Revised Acts (LRC) Classified List of Legislation (LRC) Translations (acts.
(2)The Commissioners may also cause the subsoil under public or private roads, highways, streets and footpaths and any railways, sidings, tunnels, streams, watercourses, sewers, drains, pipes, hydrants, gas mains, electric cables, wires and apparatus as shall be in or near the intended situation of the works to be either temporarily or permanently opened up, broken up, crossed, altered, extended, diverted or otherwise interfered with as they shall think necessary or convenient for making and completing the works or in connection with the works or any of them or the operations or conveniences connected therewith or for any of the purposes of their undertaking, provided that the Commissioners do previous to opening up or otherwise interfering with the same provide in lieu of such railways, sidings, tunnels, streams, watercourses, sewers, drains, pipes, hydrants, gas mains, electric cables, wires or apparatus, good and sufficient means of passing and repassing or conducting traffic by railways or sidings and good and sufficient means for conveying off the water and sewage from the adjoining or neighbouring lands and premises affected and sufficient alternative electric cables, wires and other apparatus for such purposes as the electric cables, wires and other apparatus so to be altered or interfered with are accustomed to serve, as convenient in all respects as the tunnels, streams, watercourses, railways, sidings, sewers, drains, pipes, hydrants, gas mains, electric cables, wires and apparatus to be opened up, broken up, crossed, altered, extended, diverted or otherwise interfered with as aforesaid.
- Before interfering under this Order with any works under the control of a local authority the Commissioners shall give three weeks previous notice in writing to such local authority of the nature of theirintended interference and the Commissioners shall exercise their powers in respect of any such works to the reasonable satisfaction of such local authority.
- The Commissioners shall not be authorised by virtue of this Order to interfere with any work under the control of any of the following bodies, that is to say the Electricity Supply Board, Córas Iompair Éireann or the Wicklow Gas Works without having obtained the previous consent in writing of such body or of the Minister who, before giving such consent, shall consult with such body and consider any representations which such body shall make to him.
- Subject as aforesaid in case of any dispute or difference between the Commissioners and any person or body aggrieved by anything done or omitted to be done by the Commissioners in exercise of their powers under this Order every such dispute or difference shall be referred with full power to award costs, to the final decision of two Arbitrators, one chosen by each party, and if the Arbitrators disagree, of an Umpire chosen by the Arbitrators before they sit, or in the event of disagreement, by the President for the time being of the Institution of Civil Engineers of Ireland, and shall be deemed to have been so referred in pursuance of an arbitration agreement executed by the parties.
- Nothing in this Order shall affect any right of the State to or over foreshore or any lands which have at any time been foreshore.
- Nothing in this Order shall authorise any interference except by consent of the Minister for Posts and Telegraphs with any telegraphic lines of the Minister for Posts and Telegraphs as defined by the Telegraph Acts, 1863 to 1953, or other property of the Minister for Posts and Telegraphs, or any of the rights of the Minister for Posts and Telegraphs under the said Acts.
- Save as in this Order otherwise expressly provided nothing in this Order contained shall take away, lessen, prejudice, alter or affect any of the duties, rights, privileges, property, power and authorities of the Electricity Supply Board or Córas Iompair Éireann.
- All costs, charges, fees and expenses of or incidental to preparing and obtaining this Order or otherwise incurred in relation thereto shall be paid by the Commissioners out of their funds. GIVEN under my Official Seal this 5th day of August
- ERSKINE H. CHILDERS, Minister for Transport and Power. EXPLANATORY NOTE The effect of this Order is to authorise Wicklow Harbour Commissioners to carry out works at Wicklow Harbour consisting of repairs to the East Pier, the Packet Pier and North and South Quays. Privacy Statement Accessibility European Legislation Identifier (PDF) Open Data License Ráiteas Príobháideachais Inrochtaineacht Aitheantóir Eorpach Reachtaíochta (ELI) Ceadúnas Sonraí Oscailte Liosta Fianán © Government of Ireland. Oireachtas Copyright Material is reproduced with the permission of the Houses of the Oireachtas © Rialtas na hÉireann. Atáirgtear ábhar faoi Chóipcheart le cead ó Thithe an Oireachtais